Võru Vesi AS
TO6 Environmental protection, climate change mitigation and adaption
Start date: 01.07.2023
End date: 31.12.2023
Duration: 6 Months 0 Days
Improving the quality of shared water assets by reducing their pollution load (including improving wastewater treatment facilities, improving solid (household and industrial) waste management and relevant facilities, and reducing pollution that is caused by the agricultural sector
299 991,39 EUR
693 971,28 EUR
South Estonia
Completed (6)
Overall objective:
To improve the quality of shared water assets in Võru area by reconstructing the wastewater pipes in a problematic pipe section in Võru town.
Specific objective:
Newly reconstructed wastewater piping on Pikk Street in Võru town (approximately 1100 metres of wastewater pipes).